Phosphorus Removal
A four month pilot study was constructed in the summer of 2006 to study the effects of “BIO-SYSTEMS” ‘P’ product and how it lowers the phosphate in wastewater effluent. After the trial we compared the results with the previous 4 months and also to that same 4 month period the year before, checking to make sure the influent numbers and conditions were similar. As a result we found “BIO-SYSTEMS” product had a 14% increased reduction rate.

Benefits of BIO-SYSTEMS “P”
- Lowers BOD • Increases phosphorus “Luxury Uptake”
- Enhanced phosphorus removal • improves Effluent
- Reduce Odors • Fast Start-up
Phosphorus Removal
A four month pilot study was constructed in the summer of 2006 to study the effects of “BIO-SYSTEMS” ‘P’ product and how it lowers the phosphate in wastewater effluent. After the trial we compared the results with the previous 4 months and also to that same 4 month period the year before, checking to make sure the influent numbers and conditions were similar. As a result we found “BIO-SYSTEMS” product had a 14% increased reduction rate.

Benefits of BIO-SYSTEMS “P”
- Lowers BOD • Increases phosphorus “Luxury Uptake”
- Enhanced phosphorus removal • improves Effluent
- Reduce Odors • Fast Start-up